The project aims to build a 120-meter-long hall with a 24-meter opening. A temperature-controlled storage room for picking up vegetables and potatoes to be sorted and packaged will be included in the hall. The warehouse has a storage capacity of up to 2,000 tons in box pallets.

The project also includes the installation of a sorting and packing line for vegetables and potatoes with a packing capacity of up to 10 tons per hour.

The eligible value of the project is 3 million euros, of which 1.2 million euros are non-reimbursable funds.